How Much Concrete Do You Need for a 8×8 Slab?
Calculate the exact ready-mix yardage, 80-lb and 60-lb bag counts, subbase gravel, and rebar reinforcement needed for a 8×8 concrete slab (64 sq ft).
Exact net volume: 0.79 yd³ (21.33 cu ft)
Standard application: Pedestrian walkways, back patios, gazebo bases, small garden sheds.
Exact net volume: 1.19 yd³ (32 cu ft)
Heavy-duty application: Garage floors, carports, RV pads, hot tub foundations, machinery shops.
How to measureSlab dimensions diagram
8×8 Slab Concrete Volume & Bag Chart
Reference table comparing exact net volume and recommended order amounts across standard residential slab thicknesses for 64 square feet:
| Slab Thickness | Recommended For | Net Cu Ft | Net Cu Yds | Order (Yds + 10%) | 80 lb Bags (+10%) | 60 lb Bags (+10%) |
|---|---|---|---|---|---|---|
| 4 Inches Recommended | Sidewalks, Patios, Light Sheds | 21.33 ft³ | 0.79 yd³ | 0.87 yd³ | 40 | 53 |
| 5 Inches | Workshops, Carports, Light Trucks | 26.67 ft³ | 0.99 yd³ | 1.09 yd³ | 49 | 66 |
| 6 Inches | Two-Car Garages, RVs, Hot Tubs | 32 ft³ | 1.19 yd³ | 1.3 yd³ | 59 | 79 |
| 8 Inches | Heavy Machinery, Farm Slabs | 42.67 ft³ | 1.58 yd³ | 1.74 yd³ | 79 | 105 |
* Bag calculations assume 0.60 cu ft per 80-lb bag and 0.45 cu ft per 60-lb bag, with a 10% safety allowance for subbase compaction and forms.
Engineering & Code Specifications for a 8×8 Slab
Guidelines aligned with American Concrete Institute standard ACI 302.1R (Guide for Concrete Floor and Slab Construction) and IRC Section R506:
Subbase & Compaction
4" crushed aggregate (Item 4 or crusher run) compacted with a vibratory plate compactor
Rebar & Mesh Reinforcement
6×6 W1.4/W1.4 welded wire mesh or macro-synthetic fibers for tool sheds; #4 rebar at 16" OC on 2" chairs for hot tub pads
Contraction & Control Joints
Cut a single cross joint at 4 ft in both directions (dividing into four 4×4 ft squares) or omit if unreinforced pad is under 8 ft
Mix Strength & Curing
Specify 3,500 to 4,000 PSI ready-mix concrete with 5% to 7% air entrainment in cold climates. Moist cure with wet burlap or spray a curing compound (ASTM C309) for a minimum of 7 days before traffic.
Project Design Notes for 8×8 (Small Shed / Hot Tub Pad)
An 8×8 slab covers 64 sq ft, making it a very common size for modular resin garden sheds, trash enclosure pads, or outdoor hot tubs. When building for a hot tub holding 3,000–5,000 lbs, pour at 5" to 6" thickness with #4 rebar and 4,000 PSI concrete to avoid localized punching shear.
Estimated Cost for a 8×8 Concrete Slab
Concrete material cost delivered to your jobsite ($125 to $165 per cubic yard). Excludes wooden forms, rebar, gravel subbase, and tool rental.
Typical contractor turnkey rate ($6 to $12 per sq ft for 64 sq ft). Covers site excavation, formwork, crushed stone base, rebar grid, pour, screed, and broom finish.
Explore Other Concrete Slab Sizes
Frequently Asked Questions: 8×8 Slab
How many cubic yards of concrete do I need for a 8x8 slab at 4 inches thick?
For a 8×8 slab at 4 inches thick (64 sq ft), you need exactly 0.79 cubic yards (21.33 cubic feet) of concrete. When ordering ready-mix concrete, contractors recommend adding a 10% waste allowance for subbase irregularities and spillage, bringing your recommended order to 0.87 cubic yards. The formula is: (8 ft × 8 ft × 0.333 ft) ÷ 27 = 0.79 yd³.
How many 80 lb bags of Quikrete do I need for a 8x8 slab?
For a 4-inch thick 8×8 slab, you will need 40 eighty-pound bags of concrete (or 53 sixty-pound bags), which includes a 10% safety margin. If pouring a heavy-duty 6-inch slab, you will need 59 eighty-pound bags (or 79 sixty-pound bags). Each standard 80-lb bag yields approximately 0.60 cubic feet of mixed concrete.
Should a 8x8 slab be 4 or 6 inches thick?
Choose your slab thickness based on intended use: A 4-inch pour (0.87 yd³ with waste) is standard for pedestrian patios, walkways, and small garden sheds holding under 100 sq ft. A 5 to 6-inch pour (1.3 yd³ with waste) reinforced with #4 rebar on an aggregate subbase is strongly recommended for garage floors, carports, RV pads, hot tubs, or any application supporting vehicle axle weights per ACI 302.1R and IRC R506.
How much does a 8x8 concrete slab cost?
Ready-mix concrete delivery costs between $125 and $165 per cubic yard. For a 4-inch 8×8 slab (0.87 yd³ ordered), materials will cost approximately $109 to $144. For a 6-inch slab (1.3 yd³ ordered), ready-mix concrete runs $163 to $215. A complete turnkey installation by a concrete contractor (including grading, forms, gravel base, rebar, pour, and finishing) typically ranges from $6.00 to $12.00 per sq ft, or $384 to $768 total for 64 sq ft.