Free Imperial & Metric Updated Nov 2026

Deck Footing Calculator

Estimate the number of deck footings and the concrete to fill them. Enter your deck dimensions and grid spacing to estimate a full rectangular support grid and concrete volume. Ledger attachments and beam layouts are not modeled. Footing size and spacing should follow your local code and the loads your deck will carry.

Enter Dimensions

Quick Presets:

From the same corner, enter length offset x width offset per footing, e.g. 0x0, 8x0. Positions override count and grid.

Zero uses the rectangular grid estimate. A positive count uses your plan for the concrete order.

Max distance between footings. Typically 6–8 ft for wood decks.

Typically 10–12 in for residential decks.

Must be below local frost line. Typically 36–48 in.

Results

Total Footings
9 footings
Use footing count or positions from your approved plan. Without a plan entry, this estimates a full rectangular grid including perimeter supports.
Measurement Value Unit
Concrete per footing 2.749 ft³
Bags of Concrete 80 lb bags (0.60 cu ft each) — rounds up 42 bags
Cubic Yards Total concrete for all footings 0.92 yd³
Cubic Feet 24.74 ft³
Cubic Meters 0.701 m³
Your layout
Enter Your Price
$
Estimated total $0.00

How to measureDeck Footing Diagram

Top view · deck footprint Spacing Deck width Deck length Side view · one footing Diameter Depth Grade
Deck Footing Diagram
Measure footing spacing from center to center. Measure diameter across the hole and depth from grade to the bottom. Use your approved plan for the support positions and footing dimensions.
ƒ

How the Formula Works

1

Calculate footings along each dimension

Posts per side = ⌈Deck Length ÷ Spacing⌉ + 1

Each dimension needs end posts plus one post per full span — partial spans round up

2

Calculate total footing count

Footings = Posts along length × Posts along width

Footings form a grid across the deck footprint

3

Calculate volume of one cylindrical footing

Volume (ft³) = π × (Diameter ÷ 2 ÷ 12)² × (Depth ÷ 12)

Diameter and depth are converted from inches to feet before applying the cylinder formula

4

Calculate total concrete

Total (yd³) = (Volume per hole × Footings) ÷ 27
5

Calculate bags

Bags = ⌈Total (ft³) ÷ 0.60⌉

One 80 lb bag of concrete mix yields 0.60 cubic feet — always round up

Deck Footing Count & Concrete Volume Reference

Illustrative full grid at maximum 8-foot spacing in both directions, 36-inch cylindrical depth, no waste. These are quantities, not approved layouts or frost depths:

Deck Size (ft)Hole DiameterFooting CountCubic Yards80 lb Bags
10′ × 10′ Deck8"90.3516
10′ × 10′ Deck10"90.5525
12′ × 12′ Deck10"90.5525
12′ × 12′ Deck12"90.7936
12′ × 16′ Deck10"90.5525
12′ × 16′ Deck12"90.7936
16′ × 20′ Deck10"120.7333
16′ × 20′ Deck12"121.0548
20′ × 20′ Deck10"160.9744
20′ × 20′ Deck12"161.4063

Frequently Asked Questions

The number of footings depends on your deck dimensions and post spacing. The formula is: footings = (ceil(length ÷ spacing) + 1) × (ceil(width ÷ spacing) + 1). A 12 × 16 ft deck with 8 ft spacing needs (ceil(16/8)+1) × (ceil(12/8)+1) = 3 × 3 = 9 footings in this full-grid model. An attached deck with a ledger and one beam, or a freestanding deck with two beam lines, has a different layout. Use an approved framing plan to choose the actual support count; this tool does not design it.

Use the locally approved frost-protection and foundation detail. Regional depth estimates are not a project-specific footing-depth requirement.

Use the footing diameter from the approved support schedule, based on loads, framing layout and allowable site bearing pressure. This calculator does not size footings.

Use the support spacing and beam/joist layout from the approved framing plan. This calculator only estimates a full rectangular support grid.

Obtain required founding depth and footing thickness from the approved detail and local requirements. Do not automatically add six inches to a frost-depth estimate.

A 12-inch diameter hole at 42 inches deep holds about 2.749 cubic feet of concrete, which is 5 bags before waste of 80 lb Quikrete (each bag yields 0.60 cu ft). Use the calculator above to get the exact bag count for your footing diameter and depth. For large jobs, ordering ready-mix is more economical than bags.

Use tube forms according to the approved footing detail and manufacturer instructions. This calculator models cylindrical volume; it does not specify excavation support or construction methods.

Use the approved reinforcement schedule for bars, ties, cover and anchorage. This calculator does not determine reinforcement from footing depth.