How Many Tons & Yards of Gravel for a 12×100 Area?
Calculate the exact crushed stone tonnage, cubic yardage, dump truck loads, and depth requirements for a 12×100 gravel driveway, parking pad, or shed foundation (1200 sq ft).
Recommended order: 16.3 yd³ (exact net: 14.81 yd³ / 400 cu ft)
Best for: Driveway resurfacing, top-dressing existing stone, walkways, and shed pads.
Recommended order: 24.44 yd³ (exact net: 22.22 yd³ / 600 cu ft)
Best for: Brand-new driveway installations over dirt, RV/boat pads, and heavy truck parking.
How to measureGravel Area Diagram
12×100 Gravel Depth & Material Reference Chart
Quick reference comparing cubic yards and tonnage across common aggregate types for 1200 square feet:
| Gravel Depth | Application / Purpose | Net Cu Yds | Order (Yds + 10%) | #57 Stone (1.4 t/yd³) | Crusher Run (1.5 t/yd³) | Pea Gravel (1.35 t/yd³) |
|---|---|---|---|---|---|---|
| 2 Inches | Light Top Dressing / Maintenance | 7.41 yd³ | 8.15 yd³ | 11.4 tons | 12.2 tons | 11 tons |
| 3 Inches | Walkway, Patio, Garden Bed | 11.11 yd³ | 12.22 yd³ | 17.1 tons | 18.3 tons | 16.5 tons |
| 4 Inches Recommended | Standard Resurfacing & Shed Pad | 14.81 yd³ | 16.3 yd³ | 22.8 tons | 24.4 tons | 22 tons |
| 6 Inches | New Driveway Base / RV Pad | 22.22 yd³ | 24.44 yd³ | 34.2 tons | 36.7 tons | 33 tons |
| 8 Inches | Heavy Equipment Roadbed / Subbase | 29.63 yd³ | 32.59 yd³ | 45.6 tons | 48.9 tons | 44 tons |
* Tonnage estimates factor in a 10% allowance for subbase compaction and track irregularities. Standard crushed stone is calculated at 2,800 lbs/yd³ (1.4 tons/yd³); crusher run/dense grade at 3,000 lbs/yd³ (1.5 tons/yd³).
The 3-Layer Gravel Driveway Engineering Rule
Laying gravel directly on top of bare topsoil inevitably causes rutting, potholes, and sinking. Professional civil roadbuilders construct gravel driveways in three structured layers:
Geotextile Subgrade Fabric
Roll out heavy-duty non-woven geotextile fabric (6–8 oz) over stripped subsoil. This prevents crushed rock from sinking into the subgrade while allowing groundwater to drain freely without turning stone to mud.
Base Layer: #3 or #4 Ballast Stone (4"–6")
Coarse, fractured 2" to 3" rock creates an interlocking structural foundation. This layer bridges soft ground, prevents wheel rutting, and provides internal void space for subsurface stormwater runoff.
Middle Layer: #57 Crushed Stone (2"–3")
Angular 3/4" clean crushed limestone or granite bridges the large gaps between the ballast stones. This creates a stable intermediate transition layer that will not shift under braking or steering.
Surface Layer: #411 Crusher Run (2")
Also known as dense grade aggregate (DGA) or road bond. Contains 3/4" crushed rock blended with stone dust. When watered and compacted with a vibratory roller, the fines bind into a hard, cement-like surface crust. Crown the center 1/2" per foot toward side ditches.
Site Preparation Notes for 12×100 (100-Foot Standard Gravel Driveway)
A 12×100 gravel driveway (1,200 sq ft) is one of the most frequently constructed residential driveway dimensions. A 4" resurfacing coat requires ~23 tons of #57 crushed limestone, while new driveway construction typically requires a multi-lift installation totalling 34+ tons.
Estimated Material Cost for a 12×100 Area
Estimated material cost for 22.8 tons of #57 stone delivered by tri-axle dump truck ($30 to $55 per ton depending on distance from local quarry).
Estimated material cost for 34.2 tons of structural stone delivered. If hiring a mini-excavator or skid steer operator for grading and rolling, add $600 to $1,500.
Explore Other Gravel Driveway & Pad Sizes
Frequently Asked Questions: 12×100 Gravel Area
How many tons of gravel do I need for a 100x12 area at 4 inches deep?
For a 12×100 area (1200 sq ft) at a standard 4-inch depth, you need 22.8 tons of #57 crushed stone (or 24.4 tons of dense grade crusher run). This calculation factors in a 10% allowance for subbase settling and compaction. At 4 inches, the volume equals 14.81 net cubic yards (16.3 cubic yards recommended order).
How many cubic yards of gravel is a 100x12 area?
At a 4-inch depth, a 12×100 area measures exactly 14.81 net cubic yards (order 16.3 cubic yards with 10% compaction). If installing a heavy 6-inch subbase layer, you will need 22.22 net cubic yards (order 24.44 cubic yards). The formula is: (100 ft × 12 ft × [depth in inches ÷ 12]) ÷ 27.
How many dump truck loads of gravel do I need for a 100x12 project?
A standard tri-axle dump truck carries between 12 and 14 tons of crushed gravel, while a tandem-axle truck holds 7 to 8 tons. For a 4-inch depth on a 12×100 area (22.8 tons total), you will need 2 tri-axle dump truck loads (~22.8 tons at 4", or ~34.2 tons at 6"). Ordering in full truckloads significantly lowers delivery surcharges.
How much does gravel cost for a 100x12 driveway or pad?
Crushed stone (#57 limestone or granite) generally costs $30 to $55 per ton delivered. For a 4-inch depth (22.8 tons), material will cost roughly $684 to $1254. For a 6-inch depth (34.2 tons), budget approximately $1026 to $1881 for stone delivery.