Post Hole Calculator

Calculate the concrete needed per post hole and across your whole project. Enter the hole diameter and depth, the post size, and the number of holes to get bags or volume, with the post displacement already subtracted. Works for fence posts, deck footings, and mailbox posts.

Enter Dimensions

Hole diameter. Common: 8–10″ for fence posts (use 3× post width rule), 12–16″ for deck posts.

Hole depth. Rule of thumb: 1/3 of post height above grade, plus 6″ below frost line.

Total number of post holes.

Actual square-post side length, not its nominal lumber size: a nominal 4×4 is commonly 3.5 inches. Used to subtract displacement.

Depth of gravel base at bottom of hole. Typically 4–6 inches for drainage.

Quikrete Fast-Setting 50 lb = 0.375 ft³; standard 80 lb = 0.60 ft³.

Add 10% for spillage and uneven holes.

Optional. Enter bag price for a cost estimate.

Results

Excavation Volume
0.24 yd³
Measurement Value Unit
Excavation Volume Total volume of all holes combined 6.54 ft³
Excavation Volume 0.185 m³
Gravel Required Gravel base for all holes 1.09 ft³
Gravel Required 0.04 yd³
Concrete Volume Concrete fill (minus gravel and post) with waste 4.78 ft³
Concrete Volume 0.18 yd³
Concrete Volume 0.135 m³
Bags per Hole Bags needed per individual hole 2 bags
Total Bags Required All holes combined including waste 8 bags
Estimated Cost Total bags × cost per bag 0 $
Your layout
Enter Your Price
$
Estimated total $0.00

How to measurePost Hole Diagram

Hole diameter Hole depth Gravel Post
Post Hole Diagram
Measure across the hole center and from grade to the bottom. The post and any entered gravel base displace concrete.
ƒ

How the Formula Works

1

Calculate hole volume (cylinder)

Hole Volume = π × r² × Depth

r = half the diameter; a 10″ diameter × 3 ft deep hole = π × (5/12)² × 3 = 1.636 ft³

2

Calculate gravel base volume

Gravel Volume = π × r² × Gravel Depth

Subtract from total hole to get concrete zone; 6″ gravel base in 10″ hole = 0.273 ft³

3

Subtract post displacement

Post Displacement = Post Width² × (Depth − Gravel Depth)

A 4×4 post (3.5″ actual = 0.292 ft side) displaces 0.292² × 2.5 ft ≈ 0.213 ft³ of concrete space; enter actual dimensions; a larger nominal size subtracts too much concrete

4

Calculate concrete volume per hole

Concrete = Hole Volume − Gravel Volume − Post Displacement

Apply waste factor: Concrete × (1 + Waste%); example: 1.636 − 0.273 − 0.213 = 1.15 ft³ net, with 10% = 1.27 ft³

5

Calculate bags required

Bags per Hole = ⌈Concrete per Hole ÷ Yield per Bag⌉

80 lb bag = 0.60 ft³ → 1.27 ÷ 0.60 = 2.11 → 3 bags per hole; total = ceiling of combined unrounded concrete volume / bag yield when sharing mixed concrete across holes

Frequently Asked Questions

As a rule of thumb, most 8-ft fence posts with a 4×4 in a 10″ × 3 ft hole need 2–3 bags of 80 lb concrete.

Bury 1/3 of the total post length. An 8-ft post needs at least 2.5 ft below grade. Add 6 inches below the frost line in cold climates.

At minimum 3× the post width. A 4×4 post needs a 12″ hole; a 6×6 post needs an 18″ hole. Go wider in sandy or loose soil.

Yes — 4–6 inches of crushed gravel improves drainage and significantly extends post life by preventing standing water at the base.

10″ × 2.5 ft deep: 1–2 bags of 80 lb. 10″ × 3 ft deep: 2–3 bags. 12″ × 3.5 ft: 3–4 bags.

Fast-setting concrete (Quikrete Fast-Setting) can be poured dry and sets in 20–40 minutes. Standard mix also works well and is slightly less expensive.

Fast-setting mix: 20–40 minutes. Standard mix: 24–48 hours before attaching fence panels. Cold weather slows the cure significantly.

It varies by location. Zone 6: 18–24″, Zone 5: 30–36″, Zone 4: 36–48″. Always check local building code — footings must extend below the frost line.